Skip to content
Anıl BilenChief Tax Inspector · Author
Menu

Practical tax guide

R&D and Technology-Zone Checks Before Full YMM Certification

Before full YMM certification, make each incentive amount on the return traceable to its evidence. A certification contract does not automatically complete every scope, timing and reporting requirement.

1. Scope and timetable

List the return period, incentive, applicable threshold, contract and report type together. Read Communiqué No. 49 with the relevant special provisions. A past-year filing extension is not a general deadline for future years.

2. Regime-specific evidence

  • Law No. 4691: project/zone approvals, qualifying profit, shared costs, intellectual property and funds.
  • Law No. 5746: centre/project scope, costs, grants, payroll, capitalisation and current/carried deductions.
  • Law No. 6550: certification, activities and separation of infrastructure income from partner deductions.
  • Article 5/B: ownership, protection certificate, income type and attribution method.

3. Three-way reconciliation

Compare project/expenditure schedules, accounting and the return/report. Explain differences from grants, periods, ineligible costs, publicly financed personnel incentives or valuation. Matching totals alone does not establish correct underlying entries.

4. Payroll and transaction taxes

Review withholding, insurance, stamp duty and relevant VAT/customs separately. Match actual work to payroll and declarations; contracts to exemption documents; and purchase lists to usage records.

5. Conclusion and the next period

Recheck used and carried amounts, temporary-account/investment duties and minimum tax. Determine which matters a full-certification report covers and whether another report is required under the applicable conditions.

Keep the review output

Record evidence links, findings, explanations and report effects for each check. This supports attachments and the next year's opening review. Pages 823–826 of the book provide application checklists, connected to its four detailed report examples.

Chapter 6 · YMM certification and application checks · pp. 719–746; 823–826

Work through the details in the book

“For practitioners, the first issue is to identify correctly the legal regime applicable to the activity, expenditure, earnings, personnel or intellectual property in the particular case, before asking which incentive is more advantageous.”

Anıl Bilen · English translation of a short passage from the Turkish second-edition manuscript

Selected areas to study

  • Scope, thresholds and deadlinesp. 724
  • Technology-zone checksp. 729
  • R&D and design checksp. 734
  • Industrial-property checksp. 738
  • Research-infrastructure checksp. 742
  • Application checklistsp. 823

The manuscript brings this topic together with calculations, accounting, payroll, returns and certification. The physical book and contents PDF are in Turkish. Page references reflect the 27 October 2026 manuscript.

Related practical guides